+27 64 987 3021 [email protected] Mon-Fri 8:00-17:30 (SAST)
Computer Room Air Conditioning Amp Air Handling

Computer Room Air Conditioning Amp Air Handling

Browse technical resources about ADSS/OPGW cables, 5G fronthaul, data center interconnect, and fiber optic testing.

  • Variable Air Volume Equipment Room Power Distribution Box

    Variable Air Volume Equipment Room Power Distribution Box

    A VAV system reduces energy costs and minimizes carbon footprint. Construction, performance, and quality set our variable air volume boxes apart from others in the HVAC industry.


  • Fiber optic cable bending degree in computer room equipment

    Fiber optic cable bending degree in computer room equipment

    Always keep the fiber optic cable bend radius at least 20 times the cable diameter during installation and 10 times after installation to prevent damage and signal loss. Proper bend radius control ensures the integrity of optical performance and protects the glass. This article provides a practical, installation-focused guide to fiber bend radius, including definitions, standards, common mistakes, and best practices.


  • Does the air curtain cabinet have a neutral wire for its power supply

    Does the air curtain cabinet have a neutral wire for its power supply

    Connection: a 2 wire low voltage (no polarity) cord from the control box to the “master” appliance. TE: For LPHW models, pipework will need to be installed above the curtain. Feed the rods through the casing and attach to fixing bracket near the bottom of the unit (see Fig 3, looking up into the air curtain. © Airtècnics 2026, All rights reserved. A 1 phase local isolator having a contact separation of at least 3mm on Live and Neutral poles must be fitted in the electrical supply to the air curtain and located in an accessible position adjacent to the unit. For safety, the air curtains never have to be. lers terminal block, the GS range has two access panels on the require a three phase (415v) electrical supply, whilst all other versions ne recessed within a false ceiling, fitted in a bulkhead, or ll models are supplied with a Signal Pro display / program panel and 10m length of RJ45. Understanding the wiring diagram of a powered aire air curtain is essential for proper installation and maintenance. This includes the power supply, motor, switch, and.

    [PDF Version]
  • Distribution box air switch configuration distance

    Distribution box air switch configuration distance

    Observe the minimum distance between the switchgear and the wall of the room. Check base frame (if used) for dimensions and positional. 1, the general switch of the household distribution box can generally choose double-pole 32-63A small air switch or isolation switch. For switchgear with evacuation ducts, the minimum room height is 2500 mm for ≤ 17. 5 kV and ≤ 40 kA, or 2800 mm for ≤ 12 kV and ≤ 25 kA. A well-chosen spot can help your system run better and last longer. The manufac uring locations for the Advance line are both ISO 9001 and 140001 certified Advance switchgear is available with UL labe m bent, 14-gauge galva-nized steel for superior rust and scratch protection. All parts. This publication was prepared under the auspices of ASHRAE Technical Committee 5. 2018 ASHRAE 1791 Tullie Circle, NE Atlanta, GA 30329 www.

    [PDF Version]
  • How much does it cost to build a cold aisle computer room

    How much does it cost to build a cold aisle computer room

    The cost of constructing a cold room can vary significantly based on its size, design, insulation materials, and equipment required. Typically, the average price range for a basic cold room starts around $10,000 and can go as high as $50,000 or more for larger, more complex installations. One of. For customization, extra piping, queries, standby performance cost, etc. On average, the cold storage construction cost per square foot ranges from $130 to $350, making it two to three times. When calculating the cost of cold room, we generally need to understand the actual project use requirements and storage requirements, and understand the size of the cold room (length, width and height), temperature of the cold room, and distribution of the cold room. Add that to the initial investment cost, and potential consulting fees and cooling costs add up quickly. Total yearly investment for enterprise data center cooling systems can easily be in the $100,000s, while. Basic small cold rooms generally cost between £3,000 and £8,000, while medium-sized cold rooms typically range from £3,000 to £15,000.

    [PDF Version]
  • Grounding of the outer sheath of optical cable in the computer room

    Grounding of the outer sheath of optical cable in the computer room

    Follow these steps at each cable entry point and termination location to achieve a compliant, safe ground bond: Identify metallic components. Strip back approximately 6–8 inches of the outer jacket using a cable slitter or ringing tool. Visually identify armor, strength members, or. Fiber optic cable transmits data as light through glass or plastic strands, which means the fiber core itself carries no electrical current and requires no grounding. The critical distinction lies in. Grounding of cable shield or outer sheath at both ends can results in circulating currents that may require cable derating, depending on the cable length and construction. A table is provided by ANSI/IEEE 525 recommending the maximum lengths of single point shield grounding. Operational grounding rules, especially for medium and high-voltage grids, may vary according to each country's regulations. Refer to Table 1 for kit part numbers. Contact your customer service representative to. Armored fiber-optic cable bonding and grounding are simple phases in the installation process but are sometimes misunderstood or omitted. It offers ruggedness and superior crush resistance.

    [PDF Version]
  • Dehumidification of the hot aisle in the computer room

    Dehumidification of the hot aisle in the computer room

    Install the dehumidifier intake on the return air path (hot aisle side) where moisture content is highest. Position condensate drainage with redundant paths. As computer room air conditioning units (CRACs) were controlled to relatively low supply air temperatures, it was not uncommon for a CRAC unit to dehumidify the room air while at the same time a different CRAC unit could be in humidification mode. Such a humidity-control strategy is like. This article explains practical approaches to air conditioning for computer rooms, focusing on maintaining stable temperatures and humidity, selecting suitable systems, and implementing maintenance practices that minimize downtime and energy use. Operating above 60% RH accelerates corrosion on copper and silver contacts inside servers. Data centers generate heat every second of every day. Servers, storage equipment, network switches, UPS systems, power distribution equipment, and high-density computing racks all produce heat that must be removed continuously.

    [PDF Version]
  • Network server room fiber optic patch cord

    Network server room fiber optic patch cord

    Fibre optic patchcords are single-, dual-, or multifibre data cables that are factory-assembled with the commonly used fibre optic connectors – LC, SC, E-2000, MTP, SN, CS, MDC, etc. – and are used to connect IT hardware (e. switches, servers) equipped with fibre optic. These short fiber optic cords connect transceivers, switches, patch panels, and servers. As data rates increase from 10G → 100G → 400G → 800G, patch cables must handle more bandwidth, more density, and stricter. As networks move to higher speeds and higher density, choosing the right fiber optic patch cords becomes critical to the reliability of your system.


Need Product Pricing?

Contact us for competitive quotes on any of our fiber optic products

Get a Quote