Browse technical resources about ADSS/OPGW cables, 5G fronthaul, data center interconnect, and fiber optic testing.

  • Grounding of the outer sheath of optical cable in the computer room

    Grounding of the outer sheath of optical cable in the computer room

    Follow these steps at each cable entry point and termination location to achieve a compliant, safe ground bond: Identify metallic components. Strip back approximately 6–8 inches of the outer jacket using a cable slitter or ringing tool. Visually identify armor, strength members, or. Fiber optic cable transmits data as light through glass or plastic strands, which means the fiber core itself carries no electrical current and requires no grounding. The critical distinction lies in. Grounding of cable shield or outer sheath at both ends can results in circulating currents that may require cable derating, depending on the cable length and construction. A table is provided by ANSI/IEEE 525 recommending the maximum lengths of single point shield grounding. Operational grounding rules, especially for medium and high-voltage grids, may vary according to each country's regulations. Refer to Table 1 for kit part numbers. Contact your customer service representative to. Armored fiber-optic cable bonding and grounding are simple phases in the installation process but are sometimes misunderstood or omitted. It offers ruggedness and superior crush resistance.

    [PDF Version]
  • Cable trays enter the fire control room

    Cable trays enter the fire control room

    Install fire barriers within the tray to isolate different fire zones. When cable trays pass through walls or floors, seal openings using fire-rated penetration sealing materials. At slab penetrations, provide 20–30 mm of firestopping and install a fire-support plate at the top. For large. Cable tray installation must comply with specific technical standards to ensure electrical safety, system reliability, and long-term maintainability. Use fire barriers, covers, and dividers to contain flame spread, especially at crossings, risers, and penetrations. The following pages address the 2014 National Electrical Code® requirements for cable tray systems as well as design solutions from practical experience.


  • Dehumidification of the hot aisle in the computer room

    Dehumidification of the hot aisle in the computer room

    Install the dehumidifier intake on the return air path (hot aisle side) where moisture content is highest. Position condensate drainage with redundant paths. As computer room air conditioning units (CRACs) were controlled to relatively low supply air temperatures, it was not uncommon for a CRAC unit to dehumidify the room air while at the same time a different CRAC unit could be in humidification mode. Such a humidity-control strategy is like. This article explains practical approaches to air conditioning for computer rooms, focusing on maintaining stable temperatures and humidity, selecting suitable systems, and implementing maintenance practices that minimize downtime and energy use. Operating above 60% RH accelerates corrosion on copper and silver contacts inside servers. Data centers generate heat every second of every day. Servers, storage equipment, network switches, UPS systems, power distribution equipment, and high-density computing racks all produce heat that must be removed continuously.

    [PDF Version]
  • What level of optical splitter is installed in the computer room

    What level of optical splitter is installed in the computer room

    In two-stage splitting applications, the first-stage optical splitter is often installed in an optical distribution box or a fiber-splitting box, while the second-stage optical splitter is often installed in a local residence or community closer to the end-user. Selecting the right splitter is crucial for building a reliable fiber optic network. PLC splitters are based on planar lightwave circuit technology, ensuring uniform signal distribution and supporting high split ratios up to 1×64 or even higher. They are ideal for large-scale deployments such as. The first level of splitting (1:4 or 1:8) is installed in a closure, not far from the central office.


  • What are the power distribution cabinets in a communication equipment room

    What are the power distribution cabinets in a communication equipment room

    A power distribution cabinet is the primary electrical enclosure responsible for receiving incoming power and distributing it safely throughout a data center or a designated electrical zone. A basic rack PDU is a fundamental device designed to distribute power to multiple pieces of equipment housed within a server rack or telecom cabinet. It ensures that your critical IT systems receive reliable and consistent power. It acts as the central switching and protection hub between external power sources and internal IT. A power distribution cabinet is a critical part of modern electrical systems. This guide aims to equip readers with an in-depth understanding of PDUs, exploring various types, features, and benefits. This section includes the specifications for constructing and building out of Telecommunications Equipment Rooms (MDF/IDFs) to be used for supporting telecommunications and other special systems.

    [PDF Version]
  • Variable Air Volume Equipment Room Power Distribution Box

    Variable Air Volume Equipment Room Power Distribution Box

    A VAV system reduces energy costs and minimizes carbon footprint. Construction, performance, and quality set our variable air volume boxes apart from others in the HVAC industry.